Plan the peat survey. Keep the evidence trail.
A desk read before anyone goes out, probe points and field files for your surveyor, and a site peat figure that updates as results come in.
Supports, and does not replace, the survey your guidance requires.

One plan, three problems teams are probing for this winter.
The method is the same on every route. What changes is the deliverable you already have to produce.

The problem
Since 15 September 2026, muirburn on any land in Scotland needs a NatureScot licence. For a non-peatland purpose, ground that NatureScot's map classes as uncertain must be surveyed on a 100 m grid, with a walkover of non-peatland areas. Peatland means peat layers more than 40 cm. NatureScot's licensing page says "We understand it may take time to carry out peat depth surveys", and that you can apply for a smaller area first and add survey data later by licence amendment.
For estates, land agents and factors, sporting managers and farm advisers.
Source: NatureScot, Muirburn licensing and Guidance: peat depth survey for muirburn licensing, and the Wildlife Management and Muirburn (Scotland) Act 2024, section 12, read 18 November 2026. Read our muirburn licensing guide.
What you receive
- 01Shows which parts of the estate the map reads as shallower and which as deeper, before survey (indicative).
- 02Helps plan which areas to survey and apply for first.
- 03Grid points laid out to the spacing the guidance sets, with field files for your surveyor.
- 04Results delivered in NatureScot's recording template, with a map. Measured points close to 40 cm are highlighted in the results pack so the record can be checked.

The problem
Peat surveys for wind and grid run in phases: a site-wide grid, then closer grids around infrastructure. A ClimateXChange study on reusing excavated peat at wind farm sites found that "more peat is often excavated than planned". Peat plans start with survey evidence.
For developers' geotechnical and environmental leads, consultancies writing peat management plans, and grid and road teams.
Source: ClimateXChange, Investigating the reuse of excavated peat on wind farm development sites, read 18 November 2026.
What you receive
- 01A desk read of where the map reads the peat as shallower and deeper, before the first grid (indicative).
- 02Probe points for each survey phase, at the spacing your project works to, with field files.
- 03One peat volume record by infrastructure element, with its range, updated as results come in.
- 04An evidence trail your peat management plan can cite.
Ranges before survey are indicative.
Ask about a Probe Plan for wind or grid
The problem
Project developers and investors need a peat volume figure before committing to a site, and a full survey is a cost in itself.
For restoration and project developers, estates and landowners exploring restoration, water companies with upland estates, and nature finance teams.
What you receive
- 01An indicative site peat volume and range from the desk, before survey.
- 02A survey planned around the decision the figure supports.
- 03An updated figure and range as probe results come in.
- 04A short evidence report with the probe log and method.
Ranges before survey are indicative. They narrow as site probes are added.
Ask about a Probe Plan for carbon or restorationDesk read, plan, survey, update. One evidence trail from desk to field to report.
Desk read
Your Pre-Survey Pack reads the site before anyone goes out, and sets the decision the survey serves.
Plan
Numbered probe points spread across the predicted depth range, with field files and a recording template for your surveyor.
Survey
Your surveyor walks the plan and records each probe in the template.
Update
Each probe updates the whole site figure and its range. You get the figure, the probe log and the method in one report.
Why plan the survey with the Vireo Neural Map
The Vireo Neural Map reads your site against the land around it and everything it has learned from measured ground.
Ranges before survey are indicative. They narrow as site probes are added.
The figure arrives with a range. Probes narrow it.
Before survey the site figure is indicative, with a wide range. As results come in, the figure and its range update, so the decision rests on the evidence you have, stated plainly.
Illustration only A fixed illustrative curve showing the format. Not a result for any site.
The Probe Plan takes over where the Pre-Survey Pack ends.
The pack reads the site from the desk and tells you where to look first. The Probe Plan turns that into a survey your team can walk, and a figure that updates as the results come back.
Pre-Survey Pack
Decision summary, evidence maps on one grid and a survey-priority plan.
See the Pre-Survey PackProbe Plan
Probe points and field files, results in the right template, and a site figure and range that update as results come in.
Ask about a Probe PlanSite Assessment
The full Vireo assessment of your site, quoted after your pack.
See a Site AssessmentThe Probe Plan is quoted per site once the Pre-Survey Pack has set the decision. Delivered by the Vireo team as a desk service. Turnaround is confirmed when we quote.
Questions by route
Muirburn licence
Does this replace the NatureScot survey?
No. On uncertain ground the survey is still required. We help you plan it and deliver the results in NatureScot's template.
Who makes the licence decision?
NatureScot. Vireo is not a regulator. Licence decisions rest with NatureScot.
Wind and grid
Can it follow our consultant's survey spacing?
Yes. Probe points for each phase are laid out at the spacing your project works to.
What does the volume record hold?
One peat volume record by infrastructure element, with its range, updated as results come in. Ranges before survey are indicative.
Carbon and restoration
How many probes will my site need?
Your plan states the number for your site and the decision it supports.
Do I need the Pre-Survey Pack first?
Yes. The Probe Plan starts from the pack's desk read and the decision it sets, so the survey is planned around that decision.
Every route
What happens to our probe data?
Your data stays yours. Every Probe Plan carries a data clause, set out in plain English in the terms when we quote, covering how returned probe results may be used.
Tell us the site, the route and when the survey needs to run.
Every enquiry is reviewed by the Vireo team. We reply within two working days. If you have not had a Pre-Survey Pack yet, we will say whether your site fits one first.
Ranges before survey are indicative. They narrow as site probes are added. Vireo is not a regulator. Licence decisions rest with NatureScot. The Probe Plan is delivered by the Vireo team as a desk service; self-serve upload and a field capture app are later builds. Contains public sector information licensed under the Open Government Licence v3.0. LiDAR: Scottish Government, Scottish Remote Sensing Portal.
