Onshore wind farm and grid evidence before the layout is fixed.
Ground conditions, water, habitat and ground motion for onshore wind farms, substations and grid connections, read by the Vireo Neural Map on one grid before anyone goes to site, with peat depth wherever there is peat. Fix turbines, tracks and cable routes on evidence, and send your survey, ecology and ground investigation teams where they count.
Every enquiry is reviewed by the Vireo team. We reply within two working days.
See it read a real site. Tap live peat, river, habitat and ground motion data before you send yours.
Explore the live map →
Water held · Ground motion · Surface change · Condition · Peat depth. One cell read through every layer.
One site, every layer
Ground, water, habitat and peat on one 50 m grid, under every turbine, track and cable.
Your records and the public evidence for your ground are placed on one grid, so every layer answers the same question at the same place. These are real outputs from one upland site, location removed.
- 4Signals on one 50 m gridDepth with a band, surface change from LiDAR, ground motion from radar, water held in the terrain.
- 3Ways to read conditionWorking classes at 1 m, a satellite read at 10 m, and one harmonised score, side by side, with the cells where they disagree.
- 1Plan for where to look nextThe cells to check first, and a probe or survey plan with its expected gain stated in advance.
From scoping to consent
Evidence for every consenting stage of a wind farm.
Site selection and scoping
Peat depth with its range, habitat and water across the whole search area, so turbines and tracks start on the strongest ground. See a live site read →
Peat depth survey
A probe plan aimed where the depth range is widest, matched to the two survey phases Scottish guidance expects. Peat survey guidance →
Peat landslide hazard and risk
Slope, depth and drainage read together, so the assessment team starts on the cells that matter. PLHRA guide →
Peat management plan
Excavation and reuse volumes that rest on depth evidence a reviewer can test. Peat management plan guide →
Grid connection and cable route
A 30 km corridor read on one grid: heritage, crossings, peat and ground motion, with 1,240 anomalies ranked to the first ten. See a corridor read →
Biodiversity net gain
Habitat baseline evidence for the statutory metric, on sites and on linear routes. BNG on linear routes →
Why this matters
Before anyone goes to site, someone has to decide where to focus. The records exist: probes in a spreadsheet, a habitat survey in a PDF, a boundary in a GIS file. The pack reads them together and answers the question.
What the evidence supports, and where to firm it up
Main findings, the key uncertainties, and the recommended next step, written for the person who has to sign off the budget.
Every layer on the same grid
Peat and soil, terrain and wetness, satellite condition, surface change and ground motion, water and catchment context, read on one 10 m grid, 1 m where LiDAR is held.
What you supplied, how it was used
Each file checked for format, coverage, date, licence and relevance, then placed on the same grid as the public sources. Not an attachment at the back.
Source, date, licence, limitation
Every figure carries where it came from, when, under what licence and with what evidence tier, so it can be explained to colleagues, clients, funders or regulators.
Where to look next, in order
The cells where the reads disagree, the gaps in your records, and a walkable plan for probing, monitoring or assessment, with the expected gain stated before anyone walks it.
Thirty minutes on the findings
One factual-correction round and one call to walk through the pack and agree the next step.
What a site check looks like
Your site, read by the Vireo Neural Map.
Peat depth across a site, ground motion under turbine bases and tracks, slope for landslide hazard, and the cells where a survey earns most. Different questions, one method. Your pack carries the layers that matter for your layout.




Proof behind every figure
Declared before it is scored. Scored once. Published either way.
Vireo sealed-test register, October 2026. See the blind-tested results
How it works
Send a boundary and your records. Get back a pack and a plan.
Send a boundary and your decision
One boundary, the decision you need to make, and a note of the records you hold. We confirm the site fits before you order.
We read your records with the public evidence
Up to ten of your files and the public evidence for that ground, placed on one grid and read together.
Pack in your hands
The pack, one factual-correction round and a 30-minute handover call on the findings and the next step.
Who it is for
Wind and solar developers
Fixing layouts and budgets on evidence before the environmental statement.
Grid and transmission teams
Screening substations, overhead lines and cable routes for peat, crossings and ground movement.
Environmental and geotechnical consultancies
Briefing peat, ecology and ground investigation fieldwork with a record that can be checked.
Launch offer
Ten sites at the launch price.
The pack supports, and does not replace, intrusive peat survey and peat landslide hazard assessment carried out to current national guidance.
Excluding VAT where applicable. The standard Site Evidence Pack price is £9,600 a site. The first three launch sites are delivered and reviewed before the remaining seven places open.
You pay £3,600 for the pack. You also receive a £3,600 credit towards a Vireo Site Assessment (£25,000), the calibrated read with sealed checks on your own probes, valid for 12 months from delivery of the pack.
Questions
Prices exclude VAT where applicable. Example outputs are from one anonymised upland site and show the format of your pack.
What does Vireo provide for a wind farm?
A site read before survey: ground motion, water, habitat and peat depth with its range on one 50 m grid, an evidence register, and a survey-priority plan for ground investigation, ecology and peat probing.
Does it cover grid connections and cable routes?
Yes. The Corridor Evidence Pack reads a route on one grid, with heritage, crossings, peat and ground motion, and ranks anomalies so the walkover starts with the ones that matter. £9,600 for the first ten corridors.
How does it fit Scottish peat survey guidance?
It plans the survey. Guidance expects a grid of about 100 m across the site, then a 10 m grid at each turbine base and probes every 10 to 50 m along tracks. The pack shows where the depth range is widest, so probing starts there.
Can it support a peat landslide hazard and risk assessment?
Yes. Slope, peat depth and drainage are read together on one grid, so the assessment team starts on the cells that matter.
What does it cost?
£3,600 a site and £9,600 a corridor for launch customers, excluding VAT. Each pack is credited against the assessment that follows.
Does it work outside Scotland?
Yes. Vireo reads sites across the UK and Ireland, with peat, habitat, water and ground motion on one grid in every nation.
Ten launch places. Is your site one of them?
Related guides and services
- Peat survey guidance for wind farms in Scotland
- Peat landslide risk assessment guide
- What a peat management plan contains
- Route desk study guide for pipelines, cables and grid lines
- BNG baseline on a linear route
- Plan a peat depth survey: Site Evidence Pack, £3,600
- See a 30 km route desk study, live