The muirburn season runs from 15 September to 31 March. Since 15 September 2026, muirburn on any land in Scotland needs a NatureScot licence. This checklist sets out, from NatureScot's own pages, what to have in place for the survey side of an application.

- Since 15 September 2026, muirburn on any land in Scotland needs a NatureScot licence.
- The season runs from 15 September to 31 March.
- For a non-peatland purpose, uncertain ground must be surveyed on a 100 m grid, with a walkover of non-peatland areas.
- Results must be typed into NatureScot's template.
This checklist sets out, from NatureScot's own pages, what to have in place for the survey side of a muirburn licence application this season. It takes no position on muirburn itself. Every item was checked against NatureScot's licensing page and survey guidance on 18 November 2026. Licence decisions rest with NatureScot.
Before you apply
- Check your land on NatureScot's interactive map: non-peatland, peatland or uncertain.
- Decide the purpose. Purposes differ between non-peatland and peatland. For a peatland purpose, NatureScot states no survey is needed.
- Decide which area goes in the first application. You can apply for a smaller area first and add survey data later by licence amendment.
- Download the coordinates (.gpx) and the survey template (.xls) for that area from the interactive map.
The survey, for a non-peatland purpose
- Uncertain ground: Method B grid at 100 m intervals or less.
- Non-peatland ground: Method A walkover, probing suspect wet or soft areas. Where peat over 40 cm is found, further measurements at 100 m or less around the point to define its extent.
- Equipment: a narrow T probe or a core sampler is best. A 1 m rod marked at 5 cm intervals is acceptable, though less accurate.
Recording
- Record the exact depth or the nearest 5 cm. A reading between 40 and 45 cm is rounded up to 45 cm.
- No "greater than" or "less than" 40 cm readings.
- A 10-digit grid reference with its two-letter prefix for each point, and a distance if you moved from the sampling point.
- Results typed into NatureScot's template. Other formats are not accepted.
Training and conditions
- Everyone who intends to muirburn has completed the Muirburn Practitioner Foundation Course. Evidence of training for one person is needed in the application.
- Have regard to the Muirburn Code. It is a condition of the licence.
Where Vireo can help
Vireo's Probe Plan supports the survey. It does not replace it, and it plays no part in NatureScot's licence decision.
- Shows which parts of the estate the map reads as shallower and which as deeper, before survey (indicative).
- Helps plan which areas to survey and apply for first.
- Grid points laid out to the spacing the guidance sets, with field files for your surveyor.
- Results delivered in NatureScot's recording template, with a map. Measured points close to 40 cm are highlighted in the results pack so the record can be checked.
On uncertain ground the NatureScot survey is still required. Vireo's map does not change what the guidance asks for. Vireo is not a regulator. Licence decisions rest with NatureScot. See the Probe Plan or read our muirburn licensing guide.
Questions and answers
When does the muirburn season run?
The standard muirburn season runs from 15 September to 31 March.
Do I need a survey for a peatland purpose?
NatureScot's licensing page states that you do not need to carry out a survey for a peatland purpose.
Can I survey part of the estate first?
Yes. NatureScot says licence holders can add survey results over time by requesting a licence amendment, so you can apply for a smaller area in the first year and submit more data later.
Does a desk map replace the NatureScot survey?
No. On uncertain ground the NatureScot survey is still required. Vireo's map does not change what the guidance asks for, and licence decisions rest with NatureScot.
Sources
- NatureScot: Muirburn licensing (read 18 November 2026)
- NatureScot: Guidance, peat depth survey for muirburn licensing (read 18 November 2026)
- NatureScot: Check your land for a muirburn application, interactive map (read 18 November 2026)
- legislation.gov.uk: Wildlife Management and Muirburn (Scotland) Act 2024, section 12; in force 15 September 2026 by SSI 2026/200
Contains public sector information licensed under the Open Government Licence v3.0. LiDAR: Scottish Government, Scottish Remote Sensing Portal.
Grid points and field files for your surveyor, and results in NatureScot's template.
See the Probe PlanTap real peat, river, habitat and ground motion data, read by the Vireo Neural Map.
Explore the live map